BKP 230 Electrical Installations | Extension of Gymnasiums TBS5, Weinfelden

Publication no.
27913-02
Published on
Procedure
Open procedure
CHF 402,542.75Awarded amount
5bids received
Awarded to
Möschinger AG

Description

Subject of the Contract:
As part of the project, the existing gymnasium will be extended by adding two additional floors for use as a secondary school. The extension will be constructed using timber element construction. The new/extended staircases will be built as double-shell structures in exposed concrete.
The two-story extension will include 12 classrooms (one of which will be equipped as a learning space), 7 group rooms, and two staff rooms with a terrace. At the heart of the school, a single-story atrium (open to the outside climate) is designed.

Special Conditions:
The renovation will take place predominantly during ongoing operations. A complete closure of the gymnasium is only planned for the duration of the timber construction work for the extension

Electrical Systems:
Lighting will be implemented with LED fixtures to provide energy-efficient illumination. Automatic lighting controls and shading systems will contribute to optimized operation.
Photovoltaics:
The entire roof surface will be covered with photovoltaic modules to maximize solar potential. The building will be fully supplied with electricity from this yield, and it will also provide a significant power contribution to the existing school, where the surplus electricity will be fed in.

Official publication: project 27913 on simap.ch. Only the version published there is authoritative.
Details
Contracting authoritySekundarschulgemeinde Weinfelden (MLR Baumanagement GmbH)
LocationWeinfelden
CantonThurgau
Contract typeWorks contract
CPV45214000
Construction work for buildings relating to education and research
Covered by international treatiesYes