Swiss Public Contracts Award
Contract awarded

Extension of the Eselriet School Complex, BKP 221.1 – Timber/Metal Windows

Publication
30335-02
Published
2026-03-31
Procedure
Open procedure
405’270Total CHF
6bids received
ZHCanton
Award1 Anbieter
4B AG
405’270 CHF · 13 awards im Register

Contracting authority's reasons

Unter Berücksichtigung der in den Ausschreibungsunterlagen festgelegten Zuschlagskriterien erweist sich das Angebot der 4B AG, 8304 Wallisellen als das vorteilhafteste Angebot. Die Zuschlagsempfängerin erreichte in allen geforderten Kriterien die höchste Punktzahl. Die Zuschlagsempfängerin hat das günstigste Angebot eingereicht. Beim Kriterium «Referenzen / Qualität» erreichte die Zuschlagsempfängerin wie die weiteren Angebote die maximale Punktezahl. Es ist damit das vorteilhafteste Angebot. Ein Angebot wurde aus der Bewertung ausgeschlossen.

Description

The Eselriet school complex is located on the south-western edge of the settlement of Effretikon, at the transition to the surrounding landscape with adjacent forested slopes and agricultural areas. The building ensemble dating from 1974 features a consistent architectural language typical of its time. Oriented diagonally to the south, the complex integrates clearly into the natural surroundings through its precise building footprint. Functionally differentiated building wings are arranged around a central playground, forming a coherent overall structure. The construction project provides for the structural extension of the school complex with a compact new building directly attached to the existing sports hall. The existing building and the extension are combined to form a coherent overall facility. From Sportplatzstrasse, a wide and clearly arranged access area is created. The new building accommodates the extensive spatial program, including facilities for school use, daytime childcare, and sports clubs, all under one roof. The access and vertical circulation concept allows both shared use and independent operation of the different user groups. Two building entrances open up the structure and clearly separate the various functions. A main staircase with lift provides access to all floors and connects the different parts of the building. The second and third upper floors follow a uniform floor plan concept. On the second floor, four classrooms with adjoining group rooms form a learning cluster around a central common and cloakroom area. The third floor accommodates the

Amtliche Publikation: Projekt 30335 auf simap.ch ansehen — massgebend ist ausschliesslich die dortige Veröffentlichung.
Details
Contracting authorityStadt Illnau-Effretikon, Abteilung Hochbau
PlaceIllnau-Effretikon
CantonZürich
Contract typeWorks contract
CPV45210000
Bauleistungen im Hochbau
International treatyYes